Unlimitedprojects.com

Details about your location

1. Rate of land
2. Rate of Buildings to be taken while calculating the cost of buildings:

	· Administrative buildings (per square ft.)
	· Air conditioned buildings (per sq. ft.)
	· Normal factory shed 12’ high (per sq. ft.)
	· Factory shed 15’ high (per sq. ft.)
3. Rate of power
4. Rate of water per 1000 ltrs.
5. Rate of interest on Term loan
6. Rate of interest on Working capital from bank
7. Any concessions or facilities available to industries at your location.

For details on subsidies, rebate on land/buildings/feasibility reports/testing equipments/pollution control equipments/DG Sets etc., you may refer to the Concessions and facilities given to Industries in different States given on this site.