For other capacities see here.
1. Production Basis:a. Plant Capacity : 1.6 M.T./batch i.e. 5 M.T./day b. No.of days : 300 days/Year c. No. of shifts per day : Three d. Efficiency : 85% i.e.4.25 M.T./day e. Production Envisaged : 1275 M.T./annum
![]()
2 Fixed Cost:
(Rs.in Lacs) a. Land Cost 1500 Sq.Mtr. @300/- 4.50 Development 0.50 5.00 b. Buildings a) Factory Building, Godowns,Laboratory 10.00 Elect.Room etc. b) Tubewell 0.50 c) Civil Work for Foundation etc. 1.00 11.50 3 PLANT AND MACHINERY:
a) Main plant 23.50 b) Accessories 4.43 c) Electric & power fittings 1.30 d) D.G. Set 3.25 e) Taxes/duties/Tr. On 23.50 @ 15% 3.53 f) Erection charges & know-how 1.50 37.51 4 OTHER PLANT AND MACHINERY:
Furnitures & Office Exp. 0.5 Preliminary & pre-oprative Exp. 1.5 2.00 Total Fixed cost 56.01 COST OF PRODUCTION/ANNUM CASH OPERATIVE EXP. Basis: 1275 MT/Annum 1. Raw Materials a. Hydrated Lime 958 2500/- 23.95 b. Chlorine 540 9000/- 48.60 c. Hydrated lime 25 2000/- 0.50 73.05 for pollution control 2. Packing Materials a. HDPE bags with PVC 5100 6 3.06 liner of 25 Kg packing b. Stitching charges 0.10 3.16 3. Utilities Connected load 110 HP work load 65 HP Power: 65x0.246x24 Hrsx300x2.50x0.85 7.42 Furnace Oil: 15 Ltrs/hr Working 6 hrs-15x6x300x10 2.70 Water: (Own) 0.00 10.12 4. Salary & Wages 5.00 5. Administrative & Misc. exp. 2.50 6. Repairs & Maintenace & spare Parts 2.00 Total Cash operative Expenses 95.83 Say 96.00 NON CASH OPERATIVE EXP. INTEREST : On term loan 42 lacs @ 16.5% 6.93 Bank loan 13 lacs @ 16.5% 2.15 Unsecured loan 8 lacs @ 18% 1.44 10.52 DEPRECIATION Building 5% 12 0.6 Plant & Machinary 20% 41.26 8.25 Others 10% 2 0.2 9.05 Total 19.57 TOTAL COST OF PRODUCTION 1. Cash operative exp. 96.00 2. Non Cash operative exp. 19.57 115.57 WORKING CAPITAL REQUIREMENT No. Item Period Total Bank Margin Money 1 Raw Materials 1/2 month 3.04 2.28 25% 0.76 2 Packing Materials 1 month 0.26 0.19 25% 0.07 3 Finished Goods 1/4 month 2.79 2.09 25% 0.70 4 Receivable 1 month 11.15 8.37 25% 2.78 5 Working expenses 2 month 3.27 0.00 100% 3.27 Grand total 20.51 12.93 7.58 COST OF PROJECT Fixed Asset 56.00 Margin for working capital 7.58 63.58 SOURCE OF FINANCE 1. Promoters contribution 13.58 2. Term loan @ 75% on fixed 42.00 assets 56 lacs 3. Unsecured loan 8.00 63.58 SUBSIDY: Not considered SALES REALISATIONS 1. S.B.P. 1275 MT 10500/- per Tonne 133.87 PROFITABILITY/ANNUM Total cost of production 115.57 Sales realization 133.87 Profit per annum 18.30 Lacs