Unlimitedprojects.com
Milk Pasteurisation Plant (Dairy)
Capacity: 20,000 ltrs expandable to 50,000 ltrs.
Project cost: about Rs 140.00 lakhs
Cost of Main Plant/Machinery: about Rs 100.00 lakhs
Main Plant/Machinery:
PLANT AND MACHINERIES
|
S.NO. |
ITEMS DESCRIPTION |
CAPACITY |
QUANTITY |
|
|
|
|
|
|
MILK
PROCESSING SECTION |
|||
|
|
|
|
|
|
1. |
Can Conveyor |
3 M |
1 No. |
|
2. |
Can tipping Bar |
|
1 No. |
|
3. |
Weighing Scale/Bowl Digital |
500 Kgs |
1 No. |
|
4. |
Dump Tank |
1000 Ltrs |
1 No. |
|
5. |
Milk Transfer Pump |
5000 Lph |
2 Nos. |
|
6. |
Milk Inline Filter |
|
2 Nos. |
|
7. |
Milk Chiller |
5000 Lph |
1 No. |
|
8. |
Hot Water Wash Point |
|
6 Nos. |
|
9. |
Raw Milk Storage Tank |
10000 Ltrs |
1 Nos |
|
10. |
SS Pipe Line And Fitting |
- |
1 Lot |
|
11. |
Milk HTST Pasteurizer |
5 Klph |
1 No. |
|
12. |
Processed Milk Storage Tank |
10000 Ltrs |
1 No. |
|
13. |
Milk Pump |
5000 Lph |
2 Nos. |
|
. |
|
|
|
|
STANDARDISATION
/POLYPACKING |
|||
|
AND
GHEE MAKING SECTION |
|||
|
|
|
|
|
|
1. |
Cream Separator
Hermatic |
5000 Lph |
1 No. |
|
2. |
Cream Balance Tank |
100 Ltrs |
1 No. |
|
3. |
Cream Ripening/Storage Tank |
500 Ltrs |
1 No. |
|
4. |
Cream Pump |
1000 Lph |
1 No. |
|
5. |
Butter Churn |
500 Ltrs |
1 No. |
|
6. |
Butter Melting Vat |
500 Kgs |
1 Nos. |
|
6. |
Butter Trolley |
500 Kgs |
1 No. |
|
7. |
Butter Milk Handling System |
|
1 Set |
|
|
Butter Molding/Packing
Table |
|
|
|
8. |
Ghee Kettle/Ghee Settling/Ghee Storage/Ghee Clarifier |
500 Ltrs |
1 No.Each |
|
9. |
Milk Packing Machine |
5000 Pouch/Hr |
2 Nos. |
|
10. |
SS Pipe Line And Fittings and Reconstitution system |
|
1 Lot |
|
11. |
Manual Portable CIP System |
400 Ltrs |
1 No. |
|
12. |
Milk Overhead Tank |
3000 Ltrs |
2 Nos. |
|
|
|
|
|
|
UTILITIES
REQUIREMENTS |
|||
|
STEAM |
|||
|
|
|
|
|
|
1. |
Steam Boiler |
500 Kg/Hr |
1 No. |
|
2. |
Pipe Lines And Fittings |
|
1 Lot |
|
3. |
Ldo Tank With Level Indicator |
500 Ltrs |
1 No. |
|
4. |
Erection Of Boiler |
|
|
|
|
|
|
|
|
AIR |
|||
|
|
|
|
|
|
1. |
Air Compressor |
15 Hp 12 Kg/Cm² |
2 Nos. |
|
2. |
Pipe Lines And Fittings |
|
1 Lot |
|
|
|
|
|
|
REFRIGERATION |
|||
|
|
|
|
|
|
1. |
Complete With Ammonia Based |
25 Tr |
1 Set |
|
|
With 20'x25'x8' Cold Room |
|
|
|
|
|
|
|
|
ELECTRICALS |
|||
|
|
|
|
|
|
1. |
Main Distribution Board |
Standard Cap. |
1 Set |
|
2. |
Motor Control Center |
Standard Cap. |
2 Nos. |
|
3. |
Industrial Cabling |
|
1 Lot |
|
|
|
|
|
|
WATER |
|||
|
|
|
|
|
|
1. |
Water Pipelining For The Plant |
|
1 Lot |
|
2. |
Erection Of Water Piping |
|
|
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
1. |
Milk Cans |
40 Ltrs |
50 Nos. |
|
2. |
Quality Control Lab |
Standard |
1 Set |
|
3. |
Plungers/Spanners/Dippers |
Standard |
1 No.Each |
|
4. |
Plastic Crates |
10 Ltrs |
2000 Nos. |
|
5. |
Effluent Treatment Plant |
50 Klpd |
1 No. |
|
|
|
|
|
|
SERVICES
AVAILABLE ON ACTUAL CHARGES |
|||
|
|
|
|
|
|
1. |
Project Designing And Layout |
|
|
|
2. |
Erection Of Complete Supplies |
|
|
|
3. |
Standardisation of Process And Products |
|
|
|
4. |
Training Of Manpower |
|
|
|
5. |
Commercial Production |
|
|
|
6. |
Marketing Strategy |
|
|
|
|
|
|
|
|
|
|
|
|