S.No. Projects Capacity per year Estimated Project Cost in lakhs
ER16 Solar Farm (Foreign Collaborator's participation of 20% available, Land required is minimum 12,000 sq. meters or 3 Acres, Turnkey implementation available. Any more information would require commissioning a pre-feasibility study costing Rs 50,000/-) 1 MW (can give upto 5 MW to 10 MW useable power per day to the Grid)  1500.00
EL06 Aluminium Foil Transformers 12,000 Nos. 20.80
EL01 Electro deposited copper foil 2000 MT 16400.00
EL02 Maintenance free Batteries 0.8 million  8110.00
EL04 Optical Fibre Cables 40,000 Fibre Kms 3500.00
EL07 Wind Power Project 20 MW 7500.00

Important Notes:

  1. The capacity and project cost in the list may vary in the detailed reports to be provided. The Project Profiles, wherever provided, on the site are indicative only and are as per the perception of authors. Although care has been taken in making these Project Profiles, the data may vary from case to case and place to place. The Project Profiles and the reports provided subsequently, are therefore, to be taken as guidelines only. Entrepreneurs are, in their own interest, advised to work out current cost estimates due to price escalations. 
  2. Some factors like rate of land, cost of construction of buildings, plant and machinery, utilities like power/ water, debt:equity ratio etc may vary from location to location and situation to situation. The profiles given here are for a particular location and situation. If you want a location/ situation specific profile/report, please provide details about your location .
  3. Wherever the Project Profiles in the list are are not provided, they can be provided on request. A detailed report can also be provided.

For all your querries and requirements please contact by email or letter: