Unlimitedprojects.com

Home Identified Projects Industry Analysis Plant & Machinery Sick Units Advertise Register Free Email

List of Rubber and Plastic Projects

Code Projects Capacity per year

Project Cost in lakhs

RP01 ABS Moulded Components 500 MT 240.00
RP02 Air Bubble Packaging Film 200 MT 320.00
RP03 Bi-Axially Oriented Polypropylene Film (Bopp Film) 800 MT 1450.00
RP04 Blood Bags 6 Million Nos. 7000.00
RP05 Co-extruded multilayer film 200 MT 75.00
RP06 Conveyor Belt 30,000 meters 100.00
RP07 Crayons 3Million Boxes 950.00
RP08 Disposable Syringes (project can be set up in 2 modules: in first only Rs 1.2 crores for syringes, in second additional Rs 1.6 crores for needles and 1.2 crores for needles assembly) 1, 2, 3, 5 & 10 ml size: 3.0 lakh nos. per day 400.00
RP09 Engine mounting - Rubber bonded 54,000 pcs 10.00
RP26 Latex thread 500 Kgs per shift 30.00
RP10 Metallised Polyester Film 250 MT 785.00
RP11 Multi Layered Collapsible Plastic Tubes 32.4MIllion Pcs. 1900.00
RP12 PET Foam (Sheets & Boards ) 3,000 TPA 4400.00
RP13 Precured Tyre Retreading by Cold process 7,000 tyres of various sizes 18.00
RP14 Plastic Corrugated Sheets 960 MT 670.00
RP15 Plastic disposable cups and plates 52,500 cups/plates per day 50.00
RP15A Plastic disposable Glasses of PP / HIPS 67 Boxes per day of 10,000 glasses each at 50% capacity utilisation 127.50
RP16 Plastic Moulded Luggage 7,750 brief cases per month. 85.00
RP17 Phthalate Plasticizers 750 MT 220.00
RP18 P.U. Moulded Components 250 MT 300.00
RP19 PVC Microporous Battery Separators 34.6 Million Nos. 355.00
RP20 Roto-moulded Plastic Water Storage Tanks 3,000 Nos. 45.00
RP21 Roto Moulded Storage Tanks 1000 MT 250.00
RP22 Rubber Condoms 60 Million Pcs. 1350.00
RP25 Surgical Gloves 5000 pairs per 8 hour shift 80.00
RP23 V-Belts and Fan Belts 12,000 mts. of various sizes 15.00
RP24 X-Ray and Photographic Film 2,000 MT 2,0000.00
 

Important Notes:

  1. The capacity and project cost in the list may vary in the detailed reports to be provided. The Project Profiles, wherever provided, on the site are indicative only and are as per the perception of authors. Although care has been taken in making these Project Profiles, the data may vary from case to case and place to place. The Project Profiles and the reports provided subsequently, are therefore, to be taken as guidelines only. Entrepreneurs are, in their own interest, advised to work out current cost estimates due to price escalations. 
  2. Some factors like rate of land, cost of construction of buildings, plant and machinery, utilities like power/ water, debt:equity ratio etc may vary from location to location and situation to situation. The profiles given here are for a particular location and situation. If you want a location/ situation specific profile/report, please provide details about your location .
  3. Wherever the Project Profiles in the list are are not provided, they can be provided on request. A detailed report can also be provided.

For all your querries and requirements please contact by email or letter:

vpcs@unlimitedprojects.com

Vinayak Project Consultants
40, JSE Building, Malviya Nagar,
Jawahar Lal Nehru Marg,
Jaipur-302001

Back to home